Why BDA and ERRCS Matter in New Jersey
From high-rises in Jersey City to hospitals in Newark and corporate campuses in Princeton, New Jersey’s diverse buildings demand reliable radio coverage for first responders. Installing BDA and ERRCS systems in accordance with the New Jersey Building Code and local fire safety requirements is mandatory for obtaining a Certificate of Occupancy in many cases.
Read More
Key Benefits Include:
- First Responder Safety: Eliminates dead zones, enabling seamless communication in stairwells, utility rooms, and other hard-to-reach areas.
- Regulatory Compliance: All systems are designed to meet NFPA codes, the International Fire Code, FCC regulations, and New Jersey-specific requirements.
- Emergency Resilience: With backup batteries and uninterruptible power supplies, communication stays active even during blackouts or severe weather.
- Inspection Support: A compliant ERRCS or BDA system helps property owners pass fire marshal inspections and meet AHJ (Authority Having Jurisdiction) requirements.
Our BDA & ERRCS Services Across New Jersey
Whether you’re managing a new construction project or upgrading an existing property, RFE Communications delivers customized BDA and ERRCS solutions tailored to your building.
Our Process Includes:
- Site Survey & Signal Testing: Measuring radio coverage across your facility to identify weak spots and interference.
- Custom System Design: Engineering solutions that account for your building’s unique architecture, from stairwells to rooftops.
- Professional Installation: Certified technicians handle antenna placement, cabling, and amplifier integration with precision.
- Testing & Optimization: Systems are fine-tuned to meet NFPA, IFC, FCC, and New Jersey Building Code standards.
- Ongoing Maintenance: Routine service, documentation, and adjustments keep your system compliant as building use or codes change.
Designed for Compliance
Every ERRCS and BDA system we install is fully compliant with national, federal, and state-level safety standards, including:
- NFPA 72 and NFPA 1221
- New Jersey Building Code
- International Fire Code (IFC)
- FCC Part 90 Regulations
- Local AHJ guidelines
- FirstNet Authority criteria
With these standards in place, your building will be prepared to support first responders while staying inspection-ready.
Why New Jersey Property Owners Trust RFE Communications
From apartment complexes along the Hudson to stadiums, hospitals, and government buildings statewide, New Jersey property owners turn to RFE Communications for one reason: reliability.
Here’s what sets us apart:
- Technical Expertise: A deep understanding of how radio signals behave in complex New Jersey building environments.
- Compliance Knowledge: We stay on top of evolving building codes and public safety regulations.
- Turnkey Support: From initial site surveys through installation and final inspection, we manage the entire process.
- Long-Term Partnership: Our team provides ongoing service and upgrades to keep your system effective for years to come.
Ready to Install BDA & ERRCS in New Jersey?
Don’t let poor signal coverage jeopardize safety. With RFE Communications, your building will have a system that’s compliant, resilient, and life-saving when it matters most. Contact us today to schedule a site evaluation or request a detailed quote for ERRCS and BDA installation in New Jersey.
Frequently Asked Questions About BDA & ERRCS in New Jersey
A DAS distributes amplified radio signals throughout your building via antennas and cabling, ensuring consistent coverage in every corner.
With an uninterruptible power supply (UPS) and battery backup, ERRCS and BDA systems remain active during power failures, guaranteeing uninterrupted communication for first responders.
A BDA amplifies weak signals in both directions, while an ERRCS is the complete system — including BDAs, antennas, cabling, and supporting equipment — that ensures coverage across an entire building.
Not every building is required to have these systems, but many new constructions and major renovations must comply with public safety communication requirements. Local fire marshals and AHJs make the final determination, and RFE Communications can conduct a site survey to confirm whether your building qualifies.
Most projects take two to six weeks, depending on building size, permitting, and complexity. Our team coordinates with contractors, property managers, and local fire officials to keep projects on schedule and within budget.
